1;Upgrading Sulphur Recovery Capacities at the Mubarekskiy Gas Processing Plant in Uzbekistan;Detailed Design and Designer’s Supervision
2;Developed Detailed Design Package and material requisitions for the Amur Gas Processing Plant Construction Project;Detailed Design Material Requisitions
3;Building Sulphur Recovery Unit No. 2 for the Diesel Hydrodewaxing Unit GDS-850 for LUKOIL-UNP;Detailed Design Designer’s Supervision
4;East-Tarkosalinskoye Field. Oil Production and Processing Facilities. Field Gas Gathering System;Construction Survey.
5;Sand Quarry at the Rogovskoye Field.;Construction Survey.
6;Comprehensive inspections of buildings (structures), equipment, utility systems, and the production site of ABZ KAPOTNYA asphalt concrete plant.;Front-End Design Documentation
7;Construction Audit Services
8;Technical Authority services as part of construction audit and monitoring
9;Chemical Analytical Laboratory. Equipment certification and reporting for the chemical analytical laboratory.;Certification Package
10;Work sites of construction companies No. 1 and 2 at the East-Messoyakhskoye Field;Basic Design and Detailed Design
11;Commissioning of Sulphur Granulation Unit (SGU), including a granulated sulphur handling and packaging unit and a signal interface between the local control system and the main control system (top level) of the East-Lambeyshor Crude Processing Plant;Detailed Design
12;Unmanned Self-Service Petrol Station. Managed the industrial safety certification and expert review for an unmanned petrol station.;Certification Package. Industrial Safety Expert Report
13;Updated the process basis of design as part of designer’s supervision for the Yuri Rossikhin Field Development Project;Detailed Design
14;Designed pipeline supports in Unit 103: 1) Developed 3D models to be used with Revit software 2) Developed the detailed design package for steel and reinforced concrete structures;Detailed Design
15;Nenets Autonomous Okrug. Rogovskoy Licence Block. Exploration Well 31P;Construction Survey
16;Design for the project “Commissioning across the TurkStream Offshore Pipeline Section”;Detailed Design
17;Registration of Hazardous Production Facility and Equipment Certification;Certification Package
18;Design for the project “Upgrading of the Gas Processing Facility No. 3 at the Pravdinskoye Field”, Tyumen Oblast, Yugra, Khanty-Mansiysk Region;Basic Design and Detailed Design
19;Compressor Equipment. Compressor Equipment Certification;Certification Package
20;Detailed Design for the project: “Extension of the Usa-Tyazhelaya Neft Oil Processing Plant at the Usinsk Oil Field”;Detailed Design
21;Chemical Analytical Laboratory. Equipment certification for the chemical analytical laboratory;Certification Package
22;Appraisal Well No. 135 at the West-Yurkharovskiy Block;Construction Survey
23;1) Construction of Appraisal Well No. 227 at the Zapolyarnoye Oil and Gas Condensate Field 2) Construction of Exploration and Appraisal Wells No. 744 at the Tektono-Chatylkinskaya Block No. 681 of the West-Chatylkinskaya Area of the West-Chatylkinskaya Licence Block 3) Construction of directional Exploration and Appraisal Wells No. 740 and 741 at the Tektono-Chatylkinskaya Block No. 681 of the West-Chatylkinskaya Area of the West-Chatylkinskaya Licence Block;Construction Survey
24;Krasnoleninskoye Oil and Gas Condensate Field. Talinskiy Licence Block. Pressurized oil pipeline between the Yuzhny Central Gathering Facility and Krasnoleninsky Central Processing Platform;Construction Survey. Basic Design and Detailed Design
25;Surveying and acquisition of baseline data for the project “Compressor Station (CS-1) Upgrade at the Priobskoye Field”;Front-End Design Documentation
26;Design for the project: “Infrastructure Upgrade for GPN – BT South Terminal for the Integration of a Bitumen Production Unit (Foreign Make)”;Basic Design and Detailed Design
27;Certified a mobile multistage bitumen production unit (foreign make) and obtained permits in accordance with Russian laws;Certification
28;Audited petroleum storage facilities, assessed technical and operational risks, and prepared the key design options for the petroleum storage revamp, including a cost estimate;Audit
29;"Feasibility Study of the Facility “Revamping of the Gas Processing Facility No. 3 at the Pravdinskoye Field”;Feasibility Study
30;Developed the design package for the construction of the Gas Processing Complex, a part of the Complex for Processing Ethane-Rich Gas in Ust-Luga. Feedstock/Product Tank Farm;Basic design
31;Developed bases of design for the Shymkent Refinery;Regulations
32;Designer’s supervision of construction progress at the liquefied petroleum gas loading, storage and offloading facility;Designer’s Supervision
33;Design and survey for the project “Design of a Tank Farm with a Boiler House for Heavy Petroleum Products”;Key Design Options. Basic design. Support during the Basic Design Expert Review
34;Developed Detailed Design package and cost estimates for compressor house revamp;Detailed Design
35;Design and survey for the Tebukskoye Oil Field Development Project;Key Design Options. Detailed Design. Support during the Basic Design Expert Review
36;Advanced petroleum refining complex at the Gazprom Neft-Omsk Refinery, including amine treatment plants, sour water stripping units and sulphur recovery plants;Detailed Design
37;Needle coke plant at the Gazprom Neft-Omsk Refinery;Detailed Design
38;Developed the Key Design Options for the Yaraktinskoye OGCF Development Project. Gas Production and Processing Facilities. Construction of gas production and injection wells, gas gathering and injection pipelines, Stage 2;Key Design Options
39;Developed the Declaration of Conformity for the hazardous industrial facility, i.e., the Gas Processing Plant of the South-Kislovsky Gas Condensate Field;Contractor – 100%
40;Design and survey for the Markovskoye OGCF Development Project. Gas Production and Processing Facilities;Key Design Options. Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
41;Hydrogen Sulfide Removal Unit (MK-2);Detailed Design
42;Developed the FEED package for the upgrade (revamping) of the washing and steaming station at the Novosibirsk Branch of PGK;Feasibility Study Development
43;Leak detection system at the Yamburg−Urengoy gas condensate pipeline, lines I and II ;Detailed Design
44;Design and survey for the Yareyuskoye Oil Field Development Project;Key Design Options. Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
45;Design and survey for the construction of multi-well pads No. 4, 5, and 6 of the East-Sarutayuskoye Oil Field;Key Design Options. Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
46;Regeneration gas treatment unit for the catalytic cracking unit;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
47;Design and survey for the Koptevskoye Field Development Project;Key Design Options. Detailed Design. Support during the Basic Design. Expert Review. Designer’s Supervision during the Facility Construction
48;Design and survey for the construction of well No. 1 at the Koptevskoye Field;Key Design Options Detailed Design. Support during the Basic Design. Expert Review. Designer’s Supervision during the Facility Construction
49;Developed the Declaration of Conformity for the hazardous industrial facility, i.e., the Gas Processing Plant of the South-Kislovsky Gas Condensate Field;Contractor – 100%
50;Construction of a backup process line for the elemental sulphur production unit;Detailed Design
51;Sulphur plant as part of the hydrocracking complex;Detailed Design
52;Construction of a new double-unit sulphur recovery facility for dry hydrocarbon gas, including a rich-amine regeneration unit;Detailed Design
53;Sour Gas Dehydration Unit;FEED
54;Polyethylene unit;Detailed Design
55;Design for the full-field development of the Bayandyskoye Oil Field (Nizhnekamskaya and carboniferous reservoirs) Oil Processing Plant;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
56;Design package for the Booster Compressor Upgrade at the Alekseevskaya Gas Processing Facility;Basic design
57;Design and survey for the construction of multi-well pads No. 4, 5, and 6 of the East-Sarutayuskoye Oil Field. Oil Processing Plant;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
58;Basic Design and Detailed Design for the Rossikhin Field Development Project (full-field development);Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
59;Basic Design and Detailed Design for the East-Sarutayuskoye Field Development Project. ;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
60;Detailed Design for the Kharyaginskoye Oil Field. Stage 3. Package 4. Upgrade of the Central Gathering Station;Detailed Design. Support during the Industrial Safety Expert Review
61;Basic Design and Detailed Design for the project “Oil and Gas Gathering from Wells No. 301 and 304 at the Rossikhin Field”;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
62;Basic Design and Detailed Design for the project “Oil and Gas Gathering from Wells No. 21, 21a, 1r, 22 at the East-Sarutayuskoye Field”;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
63;Design Work. Revamping of Gas Facilities at the South-Khylchuyu Power Park;Detailed Design
64;Detailed Design. 35/10-kV substation to ensure temporary power supply throughout the construction of the Yury Rossikhin field facilities;Detailed Design
65;Design and Survey. Construction of multi-well pads No. 233, 209 bis, 155 at the Kyrtayelskoye Oil Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
66;Design and Survey. Construction of multi-well pads No. 566, 583, 2 at the Michayuskoye Oil Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
67;Design and Survey. Construction of multi-well pads No. 61 at the Pashninskoye Oil Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
68;Design and Survey. Construction of multi-well pads No. 2, 4, 8, 28r at the South-Lyzhskoye Oil Field;Key Design Options, Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
69;Design and Survey. Rasyuskoye Oil Field development for the commercial production period. Multi-well pads No. 30 and 32. Reservoir Pressure Maintenance System;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
70;Design and Survey. Preparations for the Basic Design for the construction of production and injection wells at the South Kyrtayelskoye Oil Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design. Expert Review Designer’s Supervision during the Facility Construction
71;Design and Survey. Expansion of the Modular Horizontal Pumping System (MHPS) at the South-Lyzhskoye Oil Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
72;Design and survey for the project of construction of multi-well pad No. 78 at the Petelinskoye Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review
73;Design and survey for the project of construction of multi-well pads No. 62, 64, and 66 of the Petelinskoye Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review
74;Design and survey under the project of construction of well clusters No. 82, 83 of the Petelinskoye Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review
75;Design and survey for the project of construction of multi-well pad No. 7 of the East-Sarutayuskoye Oil Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
76;Design and survey for the North Motor Road at the North-Saremboyskoye Field” between the Verkhneangareysky and Angareysky Licence Blocks and the North Motor Road at the Tedinskoye Field of the North-Yareyaginsky Licence Block;Key Design Options. Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction
77;Design and survey for the following assets operated by RITEK-Samara-Nafta: Construction of well No. 631 at the Apalkovskoye Oil Field, wells No. 215 and 219 at the West-Bulkunovskoye Oil Field, well No. 32 at the Novo-Dubrovskoye Oil Field, well No. 1005 (injection well) at the Bulatovskoye Oil Field, well No. 17 at the Lapinskoye Oil Field, and well No. 215 at the Brusovskoye Oil Field;Key Design Options. Basic Design and Detailed Design. Support during the Basic Design Expert Review. Designer’s Supervision during the Facility Construction